LIST OF WORK FOR YEAR 2010-2011 |
|||||||
| Sl.No. | Name of Construction Activities | Estimated Amt. | Work order Amt. | Final Payment | Name of Contractor | Statues | Remarks |
| 1 | T.R,Giri(Engg.) | ||||||
| 1 | Construction of staff qtr. At Tshimalakha General Hospital | 10178630.00 | 12949506.00 | M/s Z&K Construction,Chukha | Spillover | ||
| 2 | Construction of 3unit classroom & water supply at meritshemo Primary School. | 1904910.00 | 1434127.08 | M/s Kuchumo construction,Chukha | Spillover | ||
| 3 | Construction fo Adm.block &2unit classroom at Pachu Primary school. | 2003020.00 | 2135597.14 | M/s Jamtsho Construction,Chukha | Spillover | ||
| 4 | Construction of 6unit classroom,toilet & water supply at Rangaytong School. | 3007365.00 | 3261120.70 | M/s Jamtsho Construction,Chukha | Spillover | ||
| 5 | Construction of Principal's qtr. At Allaykha CPS. | 1177610.00 | 1074227.35 | M/sTshangla Construction,Chukha | |||
| 6 | Construction of fencing & toilet at Allaykha CPS | 528950.00 | 369888.37 | M/s Ogyen Construction,Chukha | |||
| 7 | Construction of fencing & toilet at Mebesa CPS. | 534530.00 | 385552.00 | M/s TA Construction,Thimphu | |||
| 8 | Construction of Principal's qtr. At Rangaytong CPS | 1106770.00 | 1475197.65 | M/sDruk Pelri Construction,Thimphu | |||
| 9 | Major maintenenance of Chungkha LSS | 316310.00 | |||||
| 10 | Development of play field at Chukha HSS | 1995000.00 | |||||
| 11 | Construction of Community Information Centre at Bjabcho. | 1093950.00 | |||||
| 12 | Construction of fram road from Tshimasham-Tshimakha Yuekha | 2150000.00 | 1867585.86 | M/s Chencho Construction,Paro | Spillover | Gewog activities | |
| 13 | Construction of toilet & Kitchen at mebesa Lhakhang | 408755.00 | 400,000.00 | M/s Ugyen Guru Construction, Chukha | Gewog activities | ||
| 14 | Construction of fram road from Bjabcho-Techena | 3443450.00 | 3251981.40 | Gewog activities(under estimation) | |||
| 15 | Soling of bjabcho fram road | 498400.00 | 500000.00 | M/s Dupthop construction,Chukha | Gewog activities | ||
| 16 | Renovation of irrigation channel at Merbari | M/sDruk Pelri Construction,Thimphu | Gewog activities(under estimation) | ||||
| 2 | Tashi Penden(Junior Engineer) | ||||||
| 1 | Construction of 6unit class room at kamji LSS | 3,439,150.00 | 3,212,473.36 | M/s NTC Construction,Haa | |||
| 2 | Construction of Martorn Qtr. At Kamji LSS | 1,643,230.00 | 1,417,970.00 | M/s Gangla Construction,Paro | |||
| 3 | Maintenance of Kamji LSS | 788,550.00 | 708,050.00 | M/s Ugyen Guru Construction | |||
| 4 | Construction of Warden's Qtr. At Kamji LSS | 1,727,250.00 | 1,513,760.00 | M/s Kuenphen Construction,Trashigang | |||
| 5 | Major renovation of Tshimalakha General Hospital | 1,933,000.00 | 2,272,060.00 | M/s C.Wangchuk Construction,Thimphu | |||
| 6 | Science Lab/Lib at Kamji LSS | 3,014,340.00 | 2,859,300.00 | M/s KD Construction,T/sham | |||
| 7 | Geling Gempa and Bhubu Gempa | 237,430.00 | Departmently | ||||
| 8 | Re-reoofing of Geling Gempa | 391,535.00 | Departmently | ||||
| 9 | Omchu Irrigation Chennal | 765,763.00 | Departmently | ||||
| 3 | Dorji(AE-III) | ||||||
| 1 | Construction of MPH at Darla MSS | 9,323,290.00 | 9,002,373.09 | M/s Druk Meber Construction,Phuentsholing | Completed | ||
| 2 | Construction of Adm.block at Sinchula PS | 3,431,190.00 | 3,896,433.87 | M/s Tashi Construction,Chukha | Completed within FY | ||
| 3 | Consyruction of Basket ball court at Darla MSS | 835,850.00 | 866,129.59 | M/s Pealing Construction | Completed within FY | ||
| 4 | Expension of football ground at Darla MSS | ||||||
| 5 | Construction of Adm.block at Tashilakha. | 1,077,225.00 | 876,026.95 | M/s Druk Norphel Construction. | Completed within FY | ||
| 6 | Construction of Principal Qtr. At Tshimasham PS | 1,570,800.00 | 1,452,132.00 | M/s S.Yeozer Construction | Completed within FY | ||
| 7 | Construction of hostel at sinchula PS | 1,577,600.00 | 1,480,756.89 | M/s Sonam Construction. | |||
| 8 | Construction of Adm. Block at T/sham PS | 2,990,760.00 | 2,995,795.49 | M/s LND Construction. | Nu.1500000.00 to be kept as spill over | ||
| 9 | Construction of Staff qtr. At Darla BHU. | M/s Passang Construction. | bid under elevation | ||||
| 10 | Major maintenance of Darla BHU | ||||||
| 11 | Construction of fencing at Tshimasham PS | M/s Zeko Construction | bids under elevation. | ||||
| 12 | Maintenance of RNR-EC, retaining wall and toilet at Darla RNR-EC | 1,446,665.00 | 1,106,158.63 | M/s Zhingcho Wangmo Construction. | completed | ||
| 13 | Approach road to Chemicial store at T/sham | 520,850.00 | M/s Rinzin Wangmo,Construction. | ||||
| 14 | Construction of community Information centre at Darla | 1,097,100.00 | M/s Nidup Construction. | Work Awarded | |||
| B | GEOG ACTIVITIES(DARLA) | ||||||
| 15 | Construction of ORC at Dojangchi | 1,665,370.00 | 1,298,199.21 | M/sPholha Construction,Thimphu | completed | ||
| 16 | Construction of ORC at Samachen | 1,601,803.77 | M/s tashi Dargay,Construction | ||||
| 17 | Construction of Irrigation Channel at Shakhu | 26231m | able to procure HDPE pipe for this FY year because of Budget constraint | materials under procurement | |||
| 18 | Construction of Chumilakha to Gedu farm road(8.5Km) | M/s Penden Lham Construction. | |||||
| 4 | Thinley Penjor(Engineer) | ||||||
| 1 | Maintenance of raods and parking, construction of water supply,strom water drains and street lignting at T/sham & T/lkha Township. | 3,505,220.00 | 3,681,790.75 | M/s Z&K Construction ,T/sham | Spill over form 2009-2010 | ||
| 2 | Black topping of urban roads & parking, construction of strom water drains,site,development at Laptshakha & Meritshemo township,Gedu. | 1,766,300.00 | 1,527,427.00 | M/sTsherub Construction, paro | Spill over form 2009-2011 | ||
| 3 | Construction of water supply and caretakers qtr. At Laptshekha & Meritshemo township,Gedu | 444,070.00 | 4,176,063.84 | M/s Druk Gyelyoung Construction,Gedu | Spill over form 2009-2012 | ||
| 4 | Construction of approach road to proposed Rangeytung BHU-II under Samphelling Gewog. | 2,936,700.00 | 3,085,653.73 | M/s U.S. Construction ,Thimphu | Spill over form 2009-2013 | ||
| 5 | Black topping of residential roads at above Meritshemo Township | 1,441,261.49 | 1,168,969.44 | M/s Lhoman Khagi, Construction.Thimphu | completed | ||
| 6 | Construction of caretaker qtr. At Tsimalakha and Garbage Pits at T/lakha & T/sham township. | 617,920.00 | 597,575.15 | M/s K.N.Zangpo Construction,Paro | |||
| 7 | Site development scapping, construction of strom water drains and pits at Meritshemo and Laptshakha Township,Gedu. | 523,500.00 | 450,196.59 | M/s Zamling Construction,Paro | |||
| 8 | Re-roofing of DYT hall at T/sham | 678,800.00 | - | M/s N.D.S.Construction | work started | ||
| 9 | Renovation of staff qtr. At T/lakha | 513,800.00 | - | M/s C.wangchuk Construction ,Thimphu | work awareded and yet to start | ||
| 11 | Construction of Municipal office building | work under NIT | |||||
| 12 | Construction of New by-pass road at Meritshemo township. | work under estimation | |||||
| 5 | Singay Dema(junior Engineer) | ||||||
| 1 | Construction of Principal Qtr. At Lobneykha CPS | 1,168,490.00 | 1,089,327.99 | M/s DTT Construction,T/sham | Completed | ||
| 2 | Construction of Prinicipal Qtr. At Shemagangkha CPS | 1,118,510.00 | 871,129.85 | M/s Sonam Tshemo,Construction ,thimphu | Completed | ||
| 3 | Renovation of Kuenbab at Chapcha. | 1,134,015.00 | 1,079,646.90 | M/s Nidu Dukpa Construction,T/sham | Completed | ||
| 4 | Construction of compound fencing around Chapcha PS | 588,870.00 | 585,982.80 | M/s Bjabcho Construction,Chukha | Completed | ||
| 5 | Construction of Arejekha-Tshamdra Fram Road | 3,333,600.00 | 1,843,805.75 | M/s Druk Gyelyoung Construction,Gedu | work under exection | ||
| 6 | Construction of Shemakha-Ghu Goemba fram road. | 4,114,950.00 | 2,562,500.62 | M/s Druk Gyelyoung Construction,Gedu | work under exection | ||
| 7 | mainteanance of water supply to Chapcha BHU | 137,300.00 | 173,866.00 | M/s Dee Pee Construction,Chukha | Completed | ||
| 8 | Irrigation Channel at Lobneykha Village | 2,334,060.00 | Departmently | work under exection | |||
| 9 | maintenance of water supply to Chapcha RNREC. | 116,650.00 | 133,695.00 | M/s Tshering Construction T/sham | Completed | ||
| 10 | Construction of PF Toilet at Chapcha PS | 226,305.00 | 220,325.63 | M/s Nidu Dukpa Construction,T/sham | |||
| 6 | Lobzang Yuden(Junior Engineer) | ||||||
| 1 | Maintenance of three unit class room block at Wangdigatshel PS | 249,080.00 | 232,279.43 | M/s Tshering Construction | completed within the FY | ||
| 2 | Construction of meeting hall & fencing at Ahalley RNR centre,under S/ling | 2,820,285.00 | 2,628,430.00 | M/s Damcho Construction | Nu.15lakhs kept for spillover | ||
| 3 | Construction of CIC at Pachurtar under Phuentsholing Geog. | 1,121,000.00 | 925,850.00 | M/s Deki Pelden Construction,Samtse | Nu.5lakhs kept for spillover | ||
| 4 | Construction of CIC atAhalley under S/ling Geog. | 1,123,000.00 | 1,053,962.75 | M/s Half moon Construction,Gedu | Nu.5lakhs kept for spillover | ||
| Gewog Activities(P'ling Geog) | |||||||
| 5 | Construction of farm road from gewog centre to Chiluaney | 8,835,650.00 | Ms Dawa Tshering Construction | budget will be given GNH & Nu.30Lakhs to be kept for spill over | |||
| 6 | Construction of fram road from Pachu to Lingden. | 8,370,680.00 | budget will be given GNH & Nu.25Lakhs to be kept for spill over | ||||
| 7 | Maintenance of fram road from Ramitey to Ahalley. | Can be completed within the FY | |||||
| 8 | Construction of Irrigation at Choengeykha under P/ling gewog. | 115,448.00 | Can be completed within the FY | ||||
| 9 | Construction of Suspension bridge at Chengkha Khola | Waiting for survey team of bridge section from head office. | |||||
| 10 | Bazaam/cantilever Bridge at Duti Jhepi river | Survey not done. | |||||
| RWSS | |||||||
| 11 | RWSS at Panbari,Dovan,Llgosh under Seerena Chewog,P/ling | Can be completed within the FY | |||||
| 12 | RWSS at Dhoban under P'ling | 267,179.61 | Can be completed within the FY | ||||
| 13 | Extension of RWSS source road at Chiluaney under P'ling gewog. | 252,131.64 | Can be completed within the FY | ||||
| 14 | Construction of spring water protection at Dangbari & Baldendara under P'ling gewog. | Can be completed within the FY | |||||
| 15 | Construction of spring water protection atChongaykha under P/ling geog. | Can be completed within the FY | |||||
| 16 | RWSS at Tashidingkha under P'ling gewog. | 806,000.00 | Can be completed within the FY | ||||
| FPCRF WORLD BANK Not in planned | |||||||
| Irrigation Channel | |||||||
| 17 | Renovation of Hamdina irrigation channel Chongaykha-A | 719,150.00 | Can be completed within the FY | ||||
| 18 | Renovation of Palangkha Irrigation channel-B | Survey not done | |||||
| 19 | Renovation of Sukaykhola Lingden | Survey not done | |||||
| 20 | Renovation of Lalaykha channel | not needed | |||||
| 21 | Renovation of Devithan Irrigation channel | Survey not done | |||||
| 22 | Renovation oftashidingkha Irrigation channel. | Survey not done | |||||
| 23 | Renovation of Palangkha Irrigation channel-A | 719,150.00 | Can be completed within the FY | ||||
| Gewog Activities(S/ling Geog) | |||||||
| 24 | Construction of Gup office at ahally,under S/ling | 1,406,930.00 | 1,170,485.15 | M/s Druk Menjong Construction. | Nu.5lakhs to be keep spill over | ||
| 25 | Extension of Gurungdara farm road under S/ling gewog. | 1,406,930.00 | Can be completed within the FY | ||||
| 26 | Construction of Pakashey farm road under S/ling gewog. | ready to float tender after getting all clearance. | |||||
| 27 | Construction of farm Gurungdara fram road under S/ling gewog. | 5,698,580.00 | 3,598,322.80 | M/s Druk Gyelyoung Construction. | will completed in this FY | ||
| 28 | Construction of ORC at Drungayna | 1,246,970.00 | 1,246,970.00 | M/s Tashi Tobgay Construction. | will completed in this FY | ||
| 29 | Construction of ORC at Daragoean | 1,203,170.00 | 1,083,432.00 | M/s Bidung Chokorling | will completed in this FY | ||
| FRCRF WORLD BANK Not in planned | |||||||
| Irrigation Channel | |||||||
| 30 | Renovation of Kotiline irrigation channel under s/ling gewog. | 143,160.00 | ready to give supply order no spill over | ||||
| 31 | Renovation of Irrigation channel at Pakashey under S/ling gewog | Survey not done | |||||
| 7 | Roshan Sharma(Junior Engineer) | ||||||
| 1 | Construction of ORC at Pangsila | 1402500 | 1,684,059.55 | M/s DLK Construction | Spill over | ||
| 2 | Construction of 3unit C/Room & Adm.block at Getena CPS | 2474200 | 3,845,311.40 | M/s K.D.Construction | Spill over(not yet taken over by DTC | ||
| 3 | Construction of Principal's Qtr.Getena CPS | 1,235,000.00 | 1,628,733.88 | M/s Khomang Construction | completition on September. | ||
| 4 | Construction of Toilet at Getena CPS | 320,000.00 | 397,320.82 | M/s PT construction | Completition on April.Firm is running on penalty. | ||
| 5 | Construction of Principal's qtr. At Meritsemo CPS | 1,074,261.00 | 1,035,167.55 | M/s Rinzin Gyeltshen Construction. | Completition on May | ||
| 6 | Expansion of Play field at Meritsemo CPS. | 400,000.00 | 278,031.25 | M/s Druk Star Construction. | Completetd | ||
| 7 | Maintenance of water supply at Tsimalakha General Hospital | 630,800.00 | Re-tender | ||||
| 8 | Maintenance of water supply of staff qtr. At Tsimalakha. | 168,900.00 | 182,900.00 | M/s Druk star Construction | work awarded completion on may | ||
| 9 | Maintenance of building and water supply of RNR centre at Getena Gewog | 495,400.00 | 564,819.00 | M/s Pelba Norbu Construction | |||
| Gewog Activities | |||||||
| 10 | Maintenance of Gup Office at Getena | 223,000.00 | 275,730.96 | M/s Khenjor Construction | completeion on May 17th 2011 | ||
| 8 | Kelzang Yeshi(Junior Engineer) | ||||||
| 1 | Ward extension at Gedu Hospital | 449720 | 447,452.00 | M/s T.Gyeltshen Construction | |||
| 2 | Construction of Pakashey farm road | 4911931 | 3,997,399.06 | M/s US Construction | |||
| 3 | Maintenance of staff qtr. | 122000 | 156,857.00 | M/s NDS Construction | |||
| 4 | 3unit classroom at Darla MSS | 1314185 | 1,189,280.00 | M/s Rinzin Wangmo Construction | |||
| 9 | Damcho Tshering(Junior Engineer) | ||||||
| 1 | Construction of Adm.block for Ketokha CPS | 1,249,160.00 | 1,333,197.35 | M/s Druk Choeden Construction | |||
| 2 | Construction fo Principal's Qtr. At Ketokha CPS | 1,228,000.00 | 1,626,434.70 | M/s Druk Choeden Construction | |||
| 3 | Construction of Barbed wire fencing and toilet for Ketokha CPS | 659,100.00 | 799,085.88 | M/s T.Gyeltshen Const. | |||
| 4 | maintenance of Bongo PS | 1,082,570.00 | 1,197,212.00 | M/s Bongop Construction | |||
| 5 | Maintenance of Ketokha PS | 299,175.00 | 372,868.00 | M/s KDT construction | |||
| 6 | Construction of Barbed wire fencing around Bongo PS | 532,000.00 | 613,283.25 | M/s Ayan Construction | |||
| 7 | Construction of Science lab,for Chukha HSS | 9,253,170.00 | 11,857,923.87 | M/s Druk Mebar Construction | |||
| 8 | Construction of Barbed wire fencing at Baikunza PS | 633,200.00 | 804,273.25 | M/s Pempa Construction | |||
| 9 | Restoration work for Baikunza CPS | 235,245.00 | 304,493.40 | M/s Sonam Wangmo Builders | |||
| 10 | Construction of RNRE Centre at Pakshikha | 6,226,850.00 | 6,074,189.59 | M/s NTC Construction | |||
| 11 | Construction of CIC at Pakshikha | 1,178,240.00 | 1,148,138.00 | M/s Tshoyang Construction | |||
| 12 | Clearing of Blocks for Chungkha to Toktowom PTT | 291,600.00 | Departmently | M/s Bunakha Construction | completed | ||
| Gewog Activities | |||||||
| 13 | Widening of Chumiringe to Chungkha PTT | 1,414,000.00 | 1,114,833.50 | M/s T&DT Construction | |||
| 14 | Construction of 40 seated ORC at Toktowom | 1,924,010.00 | 1,808,651.25 | M/s Sonam Wangmo Builders | Completetd | ||
| 15 | Construction of fram road at Gedu | 8,031,865.00 | 5,904,944.40 | M/s Druk Mebar Construction | Completetd | ||
| 16 | Construction of fram road from Mango to Damji | 6,977,895.00 | 4,565,348.96 | M/s Druk Gyelyoung Construction | Spill over | ||
| 17 | Construction of farm road from Gedu to Boeri | 5,267,680.00 | 4,132,628.60 | M/s Dawa Tshering Construction | Spill over | ||
| 18 | Construction of farm road from Badizam to Getena Geog centra | Lumpsum | 14,999,850.00 | M/s Chukha Construction | Spill over | ||
| 19 | Construction of lined drain for Pakshikha to Zomgang farm road under Bongo Geog. | 2,030,010.00 | 1,484,000.00 | M/s jamtsho Construction | Spill over | ||
| 20 | Construction of gabion walls for Pakshikha to Zomgang FR | 168,720.00 | 196,327.00 | M/s Gongla Construction | Spill over | ||
| 21 | Renovation of Irrrigation Channel at toktowom | 451,490.00 | Departmently | Completetd | |||
| 22 | Renovation of Irrigation channel at Pakshikha. | 387,650.00 | Departmently | Completetd in june 2011 | |||
| 23 | Construction of water Reservior at Meritshemo | 212,940.00 | Departmently | Completetd in june 2011 | |||
| 24 | Construction of Irrigation channel at Chungkha | 1,413,900.00 | Departmently | Completetd in june 2011 | |||
| 10 | Churamuni(Junior Engineer) | ||||||
| 1 | Construction of Dinning hall at T/sham Dratshang | 1,770,000.00 | 1,531,316.34 | M/s Jatsha Construction | 60%comp. | ||
| 2 | Construction of Toilet,bathroom and maintenance of water supply at T/sham dratshang. | 1,287,820.00 | 1,333,132.74 | M/s Phuentsho Yarphel Construction | Completed | ||
| 3 | Construction of Principal qtr. At Ketokha PS | M/s sangay Duba Construction | 75%completed | education,Central activities | |||
| 4 | Construction of Adm.block at Ketokha PS | 1,916,160.00 | 1,725,497.50 | M/s Dee PEE construction | 75% completed | education,Central activities | |
| 5 | Construction of BHU I at Ketokha | M/s Lamnekha Construction | acceptance given | ||||
| 6 | Construction of Toilet at T/sham Dhruethoe | M/s Phuentsho Yarphel Construction | work completed | ||||
| 7 | Maintenance of Dungna Lhakhang | 90% completed | |||||
| 8 | Construction of Metekha Lhakhang | local materials collection | |||||
| 9 | Renovation of Irrigation channel at Meta Eukha | work under progress | |||||